View all NFCC Approved Reference Documents »

RD7-1 Fire Door Inspections in University & College Buildings

First Edition: April 2025

Fire Door Inspections in University & College Buildings RD7-1 Issue: First Edition, April 2025

Golden Thread Fire Delay are the sponsors of a new reference document focussed on fire door inspections in Universities and Colleges called ‘Fire Door Inspections in University & College Buildings’.

The document was adapted by a Kings College London Working Group with the intention of sharing fire door inspection best practice to those responsible for delivering fire door compliance within the university and college sector. The First Edition was issued in April 2025.

To download an electronic version of the Reference Document please complete and submit the form above.

Complete Form to Access PDF Download

Please select your area(s) of interest:

Please tick to proceed

To request a hard copy of any of the above Reference Documents, please get in touch with Golden Thread Fire Delay

Standards & Certification

Golden Thread Fire Delay is third party accredited under BRE / LPCB schemes LPS 1197 for fire door inspection & remediation, LPS 1271 for fire door installations, & FIRAS (Warrington Exova) accredited for our other Passive Fire Protection installation services - see more information »

LPCB certificates

No Compromise: Certified by Third-Party Accreditation

Golden Thread Fire Delay are third-party accredited installers under the BRE / LPCB scheme LPS 1271, which audits our installation process both on site and in our office to ensure that our robust installation standards are maintained.

These certifications reflect our commitment to delivering high-quality fire door services that meet the rigorous standards set by independent accrediting bodies.

When it comes to quality, there is no room for compromise. Always ensure your installer has third-party accreditation. Whether you have three doors or three thousand, we can help you understand your needs and options.